Step 2: Start from the end of the ridge, rolling out Flex-O-Vent along the length of the ridge (both sides), making sure the vent sits “up-slope” from the edge of the ridge cap.
Step 3: Apply ridge cap, compressing material between the ridge cap and major rip. Fasten at the major rib using a screw gun set to at least 2700 rpm.